1ãBag and support of Filte
1ãScrew tightening of linkage par
Close the inlet and outlet valves , open the v
Cable connection mode of the electric heating for th
The shielding layer of signal line shall be single e
IEC standards are distinguished by red, white and bl
Press the switch of CPU to â
1.Check the scale configuration.2.Check the load cel
After calibration, the users can get the parameters.
The Free Calibration provides access to the span calculation screen for precalibratio